Minneapolis, MN · Updated 2026

How Much Does Post Construction Cleaning Cost in Minneapolis, MN?

Average post construction cleaning costs in Minneapolis range from $1,380 to $1,868. Get a free, customized estimate below.

Near national averageFree · No Signup Required

Post Construction Cleaning Cost Breakdown — Minneapolis, MN

ItemUnitQtyUnit PriceTotal
Rough Clean (per sq ft)sq ft2500$0.22$550.00
Final Cleansq ft2500$0.17$425.00
Window Cleaneach20$13.20$264.00
Trash / Debris Haulload2$192.50$385.00
Estimated Total$1,624.00

* Prices are estimates based on Minneapolis market rates. Actual costs may vary based on project specifics.

Public manual estimate

Same editor. Free PDF.

This public version mirrors the logged-in Manual Estimate builder so the experience stays consistent. Fill it in, size the logo, and download the clean PDF.

Business profile

Logo and company details

PDF preview follows slider

Client + project

Who this estimate is for

Scope

Scope of work

Labor

Add labor

Labor line 1

Line total$600

Materials

Add materials

Material line 1

Line total$550

Material line 2

Line total$425

Material line 3

Line total$264

Material line 4

Line total$385

Frequently Asked Questions — Post Construction Cleaning in Minneapolis

How much does post construction cleaning cost in Minneapolis, MN?

The average cost for post construction cleaning in Minneapolis, MN ranges from $1,380 to $1,868, depending on project scope, materials, and labor rates. Minneapolis costs are close to the national average.

How do I get a free post construction cleaning estimate in Minneapolis?

Use Brixor's free online estimate generator above. Enter your project details, customize line items for your specific needs, and download a professional PDF estimate instantly.

What factors affect post construction cleaning costs in Minneapolis?

Key factors include project size and complexity, material quality, labor rates in Minneapolis (MN), permit requirements, accessibility of the work area, and seasonal demand. Getting multiple estimates is recommended.